arrow-left-2arrow-left-3arrow-left-4arrow-leftchronodiggdown-arrow--lineardown-arrowearthfacebookfacebook_ (2)facebook_forward-arrowforwardgooglehomeico-downloadico-linkindustries--1industries--10industries--11industries--2industries--3industries--4industries--5industries--6industries--7industries--8industries--9linkedinmailmarkernewspaperpadlockpage-arrow-leftpage-arrow-rightpage-listpencilpinterestplay-buttonprintersearchsocial-diggsocial-facebooksocial-googlesocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-youtubestartwittertwitter_user

Leak Testing Of Battery Cells By Helium Tracing

Leak testing is a fundamental operation in the battery cell production process, in particular for the new generations of lithium-ion secondary batteries.

The perfect sealing of the housing is one of the most important features to guarantee the quality and long-term reliability of the cells. On the one hand, it is essential to prevent even the smallest electrolyte losses. These are often composed of flammable components which, reacting with ambient humidity, could generate toxic compounds. On the other hand, the possible ingress of humidity or other contaminants into the cell could compromise its correct functioning and reduce its efficiency.

If, in general, checking the tightness of the battery cells is an essential operation in the production chain of lithium-ion cells, this test is even more important with the use of batteries in electric vehicle applications, in order to guarantee the quality and safety standards typical of the automotive market

Leak testing of battery cells by helium tracing
ОПИСАНИЕ

Double Chamber machine for prismatic battery cell with central sliding cart for loading/unloading. Principle of measurement: global test in vacuum chamber with helium as tracer gas and mass-spectrometer analysis.

Machine designed to inspect complete cells before electrolyte filling and sealing.

The same type of machine can be used to check finished cells after filling and sealing, in particular using the helium as tracer gas when it has been filled in the cell with the electrolyte.

The machine provides two vacuum chambers, with manual opening and closing, assembled on a welded and painted steel frame with movable panels. The chambers work alternatively: when one chamber is closed and it’s running the test cycle, the other chamber is open for loading/unloading. The vacuum pumping system is placed behind the chambers. The cabinets containing the electric switchboard and the analysis systems are fixed to the frame, while the pneumatic boards for the distribution of the process gas are fixed to the vacuum chambers. Both chambers are opened automatically towards the center of the machine, so that the loading/unloading position is the same for both of them and it is protected by optical safety barriers. HMI is made by a touch-screen color monitor and two remote control boxes (one for each chamber) with the push-buttons and light signals for the operator. The equipment provides separate outlet ports for helium and air discharge and it is suitable to be connected to a helium recovery system.

ПРЕИМУЩЕСТВА
  • Dedicated pumping system for the analysis - Total flow
  • Pumping system placed on a cart for easy maintenance
  • Dedicated Electric and Pneumatic cabinet
  • Ventilation and Sound proofing of the pumping system
  • Totally customizable HMI interface
ТЕХНИЧЕСКИЕ ПАРАМЕТРЫ

Basic configuration of the machine

  • Predisposed for manual loading
  • Test Pressure: 3 bar abs
  • Output rate: 1 piece each 5 secs. (8 pcs each 40 secs.)
  • Leak rate: ~10-6 scc/s

Different configurations

  • Possible fully automatic solution, integrated to the assembly line
  • Several versions available (number of chambers, number of cells into the chamber, …) depending on customer’s specifications
ВАРИАНТЫ ИСПОЛНЕНИЯ
  • Leak testing of the housing

The test can first be performed on the cell housing, before the electrodes are assembled, to avoid sending leaking components to the next assembly operations

Dedicated tooling inside the station is used to seal the cell and fill it with the tracer gas (He)

leak-testing-battery-cells

  • Leak testing before electrolyte filling and sealing

After the introduction of the electrodes in the cell housing, depending on the type of battery, the cell is sealed with a cover, leaving a channel open for the next electrolyte filling. The cell can be tested in this stage to detect possible leakages of the cover welding

leak-testing-battery

  • Test of the cell after filling and sealing (Helium filling with electrolyte)

During the electrolyte filling and before sealing, it could be allowed to add an inert gas like Helium inside the cell or to perform the sealing operation in an environment saturated with Helium. In this condition a test with Helium as tracer gas in vacuum chamber can be performed

battery-cells-helium-tracing

  • Test of the cell after filling and sealing (Bombing)

The tested cell is firstly introduced into the bombing chamber, filled with high pressure Helium. In presence of a sealing defect in the housing, the helium will enter the cell.

The cell is then moved to the vacuum chamber, where the helium will be free to exit from the cell through the same sealing defect. The mass spectrometer will detect the presence of helium in the chamber and measure the size of the leakage

battery-cells

Видео
Загрузить

БУКЛЕТЫ И РУКОВОДСТВА

Буклет
Английский (3.59MB)
Немецкий (3.83MB)
Японский (1.38MB)
Корейский (4.62MB)
Закрыть
Закрыть

Запросить информацию

Укажите ваше имя
Укажите вашу фамилию
Укажите наименование компании
Укажите вашу электронную почту

Чтобы сообщение попало непосредственно в профильное подразделение, рекомендуем выбрать область из прилагаемого списка:

Укажите ваше сообщение

Перед отправкой формы следует внимательно прочитать ИНФОРМАЦИОННОЕ СООБЩЕНИЕ в отношении обработки личных данных в соответствии с Регламентом EU 2016/679.

Пожалуйста, дайте согласие с политикой конфиденциальности
Top Контакты